Welcome To Origin Wakeboard Towers
Call Us (626) 228 2780
Pay as you wish via PayPal or credit card.

EXPLODED VIEW OF ORIGIN SKI TOW BAR



Step1: Assemble the ski tow bar with supplied M12X40 bolts.



Step2: Position your ski tow bar on the deck. Once you confirm the position, fix the mounts with the supplied M12X60 bolts and nuts.

Tips: Starting each hole with your drill in reverse to prevent spider cracking of the gel coat finish.

Warning: If you are unfamiliar with your boat's construction, please consult your boat supplier before drilling holes.


Track Your Order

Want to track your order?
please enter your email
Origin Wakeboard Towers

  • 1001 N Todd Ave., Azusa, CA 91702
  • 626 228 2780
  • sales@boardoutlets.com
© 2021 Origin Wakeboard Towers. All Rights Reserved.